Beach & Spit

Advisian Spit Protection Preliminary Report Download document River, Spit and Beach Long Term Solution (Phase 2) The long term solution includes a groyne field and some 1 million cubes of sand placed on the 2,7km length of the beach from the river mouth to the southern end of Main beach, with the result of widening the beach by some 40 metres. Ongoing sand nourishment will be required to maintain the beach. The current status of the Long Term Solution (Phase2) project is as follows: Advisian completed the preliminary design of the long term solution for restoring our river, spit and … Continue reading →